Wet HydroVac Slurry Calculator | Ox-onsite

Wet HydroVac Slurry Calculator (Pilot Beta)

This calculator is a pilot project, in beta, for general information only. Not for legal or exact pricing purposes. Feedback? marketing@bartels-group.com.

Wet slurry is an inherent by-product of hydrovac excavation and must be managed. Management may incur offsite disposal fees/time or onsite containment & clean-up. Future clean-up costs cannot be reliably estimated.

Excavation Details


Required

Calculation Rationale & Assumptions
  • Volume: Primary in yd³ (1 decimal), reference in gallons (0 decimals).
  • Capacity: Truck at 90% nominal.
  • Water: 1200 gal onboard, 10% reserved => 1100 gal usable.
  • Slurry: 40% water, 60% solids.
  • Density: 2500 lb/yd³ solids.
  • Loads: Ceil(dry vol/(eff cap×0.60)).
  • Weight: Water lb = gal ×0.40×8.34; solids lb = yd³×0.60×2500; ÷2000 = US tons.
  • Fees: Flat/load, $0.10/gal, or per US ton.